Which lean tool maps the flow of materials and information from supplier to customer to identify waste?
Answer: Value stream mapping
Value stream mapping (VSM) visually documents current-state material and information flows to identify non-value-adding activities and design a leaner future state.
In Theory of Constraints (TOC), the 'constraint' or bottleneck is defined as:
Answer: The resource that limits the system's throughput
In TOC, the constraint is the weakest link — the resource whose capacity determines the maximum output of the entire system.
What is the primary goal of Total Productive Maintenance (TPM)?
Answer: Maximizing equipment effectiveness through proactive, operator-led maintenance
TPM aims to eliminate equipment losses by involving operators in maintenance, preventing breakdowns, and continuously improving Overall Equipment Effectiveness (OEE).
Overall Equipment Effectiveness (OEE) is calculated as the product of:
Answer: Availability, performance, and quality rates
OEE = Availability × Performance × Quality, capturing losses from downtime, speed reduction, and defects in a single metric.
In quality management, 'statistical process control' (SPC) uses control charts to:
Answer: Distinguish between common-cause and special-cause variation in a process
SPC control charts plot process data over time with control limits to detect when a process shifts from normal (common-cause) variation to abnormal (special-cause) variation.
What is the purpose of a 'poka-yoke' device in manufacturing?
Answer: To prevent errors or make defects immediately obvious so they cannot pass undetected