โ† All CER Flashcard Decks

Quality Assurance and Documentation Flashcards

7 cards from real CER practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Quality Assurance and Documentation flashcards as text
  1. Which element of a QA program specifically evaluates whether reprocessing staff are following documented SOPs correctly?

    Answer: Competency assessment and direct observation

    Direct observation and competency assessments measure real-world adherence to standard operating procedures by reprocessing staff.

  2. An endoscope reprocessing SOP must be reviewed and updated at minimum:

    Answer: Annually or whenever manufacturer instructions or evidence-based guidelines change

    SOPs must be reviewed at least annually and updated promptly when manufacturer IFUs or professional guidelines are revised.

  3. What does the term 'chain of custody' mean in the context of endoscope reprocessing documentation?

    Answer: A documented record tracking the scope from use through reprocessing back to storage

    Chain of custody documentation tracks each scope through every reprocessing step, ensuring accountability and traceability.

  4. During a QA review, it is found that a technician skipped the pre-cleaning step at the point of care. What is the BEST corrective action?

    Answer: Document the event, retrain the technician, and investigate if any scopes were compromised

    A documented corrective action plan including retraining and scope review is the appropriate QA response to a procedural deviation.

  5. Which of the following BEST describes the role of a culture surveillance program in endoscope QA?

    Answer: It detects microbial contamination on reprocessed scopes to identify potential reprocessing failures

    Culture surveillance swabs or flushes the endoscope after reprocessing to detect residual microorganisms indicating a reprocessing failure.

  6. A facility's QA data shows a repeated spike in ATP test failures on Monday mornings. The MOST likely explanation is:

    Answer: Endoscopes stored over the weekend may have biofilm accumulation or reprocessing was rushed before Monday cases

    Scopes stored over the weekend can develop biofilm, and post-storage reprocessing may be incomplete, explaining Monday morning ATP failures.

  7. Which regulatory body specifically accredits healthcare facilities and evaluates endoscope reprocessing quality programs?

    Answer: The Joint Commission (TJC)

    The Joint Commission evaluates healthcare facility compliance with infection prevention standards including endoscope reprocessing programs during accreditation surveys.