CDT Performance Optimization 2 — Questions and Answers
Question 1: Which print attribute most directly reduces RIP processing time for complex vector graphics?
- Increasing color bit depth
- Rasterizing vectors before submission (Correct answer)
- Embedding all fonts
- Using CMYK instead of RGB
Correct answer: Rasterizing vectors before submission
Pre-rasterizing complex vectors offloads computation from the RIP, significantly reducing processing time.
Question 2: A document workflow shows 40% idle time on the finishing unit while the printer runs. What is the best optimization?
- Add a second finishing unit
- Reduce print speed to match finishing throughput
- Buffer output with a tower stacker (Correct answer)
- Switch to simplex printing
Correct answer: Buffer output with a tower stacker
A buffer stacker decouples the printer and finisher, allowing each to run at optimal speed without idle waiting.
Question 3: When measuring document production throughput, which metric best captures the true output rate for mixed-job environments?
- Peak pages per minute
- Average job turnaround time
- Effective output pages per hour across job types (Correct answer)
- Engine speed rating from manufacturer specs
Correct answer: Effective output pages per hour across job types
Effective output PPH across varied job types accounts for setup, changeover, and mixed complexity, unlike peak or rated speeds.
Question 4: Which file format change typically yields the greatest reduction in PDF file size without visible quality loss for text-heavy documents?
- Converting images to PNG
- Downsampling images to 150 DPI
- Subsetting embedded fonts (Correct answer)
- Embedding color profiles
Correct answer: Subsetting embedded fonts
Font subsetting includes only the characters used in the document, often cutting font data size by 70–90%.
Question 5: A high-volume print center wants to minimize makeready time between jobs. Which approach is most effective?
- Grouping jobs by substrate and finishing requirements (Correct answer)
- Running all jobs at maximum engine speed
- Printing all black-and-white jobs first
- Increasing toner coverage per page
Correct answer: Grouping jobs by substrate and finishing requirements
Sorting jobs by substrate and finishing needs reduces media changes and reconfiguration, cutting makeready time significantly.
Question 6: What does 'OEE' (Overall Equipment Effectiveness) measure in a document production environment?
- The cost per printed page
- The combination of availability, performance, and quality rates (Correct answer)
- The number of operator errors per shift
- The ratio of color to monochrome pages
Correct answer: The combination of availability, performance, and quality rates
OEE multiplies availability, performance, and quality rates to give a single measure of how effectively production equipment is used.
Question 7: Which scheduling strategy best improves throughput when a production queue contains jobs of widely varying page counts?
- Shortest Job First (SJF) (Correct answer)
- First In First Out (FIFO)
- Longest Job First (LJF)
- Random scheduling
Correct answer: Shortest Job First (SJF)
SJF minimizes average job wait time and increases the number of completed jobs per unit time when job lengths vary greatly.
Which print attribute most directly reduces RIP processing time for complex vector graphics?