CDT Cost Estimation & Budgeting 3 — Questions and Answers
Question 1: Which cost category includes expenses such as facility rent, insurance, and management salaries that do not vary with production output?
- Direct material costs
- Variable costs
- Fixed overhead costs (Correct answer)
- Marginal costs
Correct answer: Fixed overhead costs
Fixed overhead costs remain constant regardless of production volume and include expenses like rent, insurance, and management salaries.
Question 2: On a CDT exam project, a quantity takeoff shows 1,450 LF of 2×6 framing lumber. If the unit cost is $0.85/LF, what is the estimated material cost?
- $1,015.00
- $1,190.50
- $1,232.50 (Correct answer)
- $1,450.85
Correct answer: $1,232.50
1,450 LF × $0.85/LF = $1,232.50 is the total estimated material cost for the framing lumber.
Question 3: Which document formally establishes the approved total project budget and serves as the baseline for cost control?
- Work breakdown structure
- Cost baseline (Correct answer)
- Change order log
- Bid tabulation
Correct answer: Cost baseline
The cost baseline is the approved, time-phased project budget that serves as the reference point for measuring and controlling cost performance.
Question 4: When converting a schematic design estimate to a design development estimate, accuracy typically improves because:
- Contingencies are eliminated
- More project details and specifications are defined (Correct answer)
- Labor rates are locked in by contract
- Material costs decrease over time
Correct answer: More project details and specifications are defined
As design progresses and more details are defined, estimators can replace assumptions with actual quantities and specifications, improving accuracy.
Question 5: A drafter is tasked with creating a cost estimate for a custom weldment. Which drawing type provides the most complete information for material cost takeoff?
- Exploded assembly drawing
- Detail drawing with weld symbols and material callouts (Correct answer)
- Orthographic projection without dimensions
- Pictorial sketch
Correct answer: Detail drawing with weld symbols and material callouts
A detail drawing with weld symbols and material callouts specifies exact dimensions, material grades, and weld types needed for accurate fabrication cost estimation.
Question 6: What is 'value engineering' in the context of construction cost management?
- Adding premium features to increase building value
- A systematic review to achieve required functions at the lowest cost (Correct answer)
- Increasing the project contingency reserve
- Applying escalation factors to future costs
Correct answer: A systematic review to achieve required functions at the lowest cost
Value engineering is a systematic review process that identifies ways to achieve the required project functions while reducing unnecessary costs.
Question 7: In manufacturing cost estimation, 'burden rate' or 'overhead rate' is typically expressed as:
- A fixed dollar amount per project
- A percentage of direct labor costs (Correct answer)
- A percentage of total sales revenue
- A per-square-foot facility charge
Correct answer: A percentage of direct labor costs
The burden rate is most commonly expressed as a percentage of direct labor costs and is applied to allocate indirect manufacturing overhead to products.
Which cost category includes expenses such as facility rent, insurance, and management salaries that do not vary with production output?