Question 1: During a pre-demolition survey, which document must be completed before any structural work begins to verify hazardous materials status?
- Demolition work plan
- Hazardous materials assessment report (Correct answer)
- Site safety checklist
- Equipment inspection log
Correct answer: Hazardous materials assessment report
A hazardous materials assessment report must be completed before demolition to identify asbestos, lead, PCBs, and other regulated substances.
Question 2: A quality control inspector finds that a load-bearing wall scheduled for demolition was not included in the structural engineer's approved drawing. What is the correct action?
- Proceed if the wall appears non-critical
- Stop work and obtain an updated engineering review (Correct answer)
- Mark the wall and continue other demolition
- Notify OSHA immediately without stopping work
Correct answer: Stop work and obtain an updated engineering review
Any discrepancy between field conditions and approved drawings requires stopping work and obtaining an updated engineering review before proceeding.
Question 3: Which ASTM standard is most commonly referenced for evaluating the condition of existing concrete structures prior to demolition?
- ASTM C39
- ASTM E2115 (Correct answer)
- ASTM C803
- ASTM D1586
Correct answer: ASTM E2115
ASTM E2115 provides standard practice for evaluating existing building structures, relevant to pre-demolition condition assessments.
Question 4: What is the primary purpose of daily quality control logs maintained during a demolition project?
- To track worker attendance and payroll
- To document work progress, observations, and deviations from the plan (Correct answer)
- To record equipment fuel consumption
- To satisfy insurance billing requirements only
Correct answer: To document work progress, observations, and deviations from the plan
Daily QC logs document work progress, inspector observations, and any deviations from the approved demolition plan to ensure accountability.
Question 5: When inspecting a demolition site adjacent to an occupied building, which clearance measurement is most critical to verify?
- Height of the demolition debris pile
- Minimum setback distance from the adjacent structure's foundation (Correct answer)
- Distance from the site entrance to the debris zone
- Height of the perimeter fence
Correct answer: Minimum setback distance from the adjacent structure's foundation
The minimum setback from the adjacent structure's foundation is critical to prevent vibration damage, undermining, or collapse of the neighboring building.
Question 6: A CDS supervisor discovers that salvaged structural steel is mixed with debris destined for landfill disposal. What QC issue does this represent?
- A permit violation only
- Improper waste stream segregation affecting recycling compliance (Correct answer)
- An OSHA recordable incident
- A minor documentation error
Correct answer: Improper waste stream segregation affecting recycling compliance
Mixing salvaged materials with landfill debris violates waste stream segregation requirements and can result in regulatory and contractual non-compliance.
Question 7: Which inspection interval is generally required for shoring systems during a progressive demolition operation?
- Only at project start and completion
- Before each shift and after any significant event such as rain or vibration (Correct answer)
- Once per week regardless of conditions
- Only when requested by the owner's representative
Correct answer: Before each shift and after any significant event such as rain or vibration