A drafter discovers an error on a drawing that has already been released to production. The correct action is to:
-
A
Initiate a formal engineering change to revise the drawing
-
B
Quietly fix the CAD file without changing the revision
-
C
Tell the machinist verbally about the correction
-
D
Redline a personal copy and file it