A drafter realizes a client's requested change would violate the local building code. The client insists the change be drawn anyway. The drafter should:
-
A
Refuse to draw the non-compliant change and notify the responsible design professional
-
B
Draw it as requested since code compliance is the inspector's job
-
C
Draw it but add a small note disclaiming responsibility
-
D
Draw it only if the client signs a waiver