CCT Quality Control & Testing Procedures Flashcards

6 cards from real CCT practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 CCT Quality Control & Testing Procedures flashcards as text
  1. What does 'first article inspection' (FAI) verify for a newly produced Casper component?

    Answer: That the first production unit conforms to all design and specification requirements

    A first article inspection (FAI) is a complete, independent verification that the first production part meets all drawing and specification requirements before full production begins.

  2. A CCT technician notices a recurring defect pattern on every third Casper unit inspected. Which quality tool is best for identifying the most likely root cause?

    Answer: Fishbone (Ishikawa) diagram

    A fishbone (Ishikawa) diagram is a cause-and-effect tool used to systematically identify and display all potential root causes contributing to a specific quality defect.

  3. Why must inspection records for Casper systems be retained for the period specified in the quality plan?

    Answer: To provide traceability and evidence of conformance in the event of a warranty claim or audit

    Retained inspection records provide documented traceability and conformance evidence needed for warranty disputes, customer audits, and regulatory reviews.

  4. What is the key difference between inspection and testing in a Casper QC context?

    Answer: Inspection examines attributes against standards; testing verifies functional performance under operating conditions

    Inspection compares physical and dimensional attributes against acceptance criteria, while testing evaluates functional performance by operating the system under defined conditions.

  5. Which ISO standard forms the framework for a quality management system (QMS) that a Casper service organization would most likely be certified to?

    Answer: ISO 9001

    ISO 9001 is the internationally recognized standard for quality management systems covering customer focus, process approach, and continuous improvement applicable to service organizations.

  6. A CCT technician completes a Casper system inspection and finds no defects. What is the proper final step before closing the quality record?

    Answer: Sign and date the checklist, attach supporting test data, and file or submit per the quality plan

    A completed inspection requires the technician to sign and date the checklist, attach all supporting test data, and formally file or submit the record as required by the quality plan.