What is the primary purpose of a User Acceptance Testing (UAT) phase before an EDC system goes live?
-
A
To train site staff on GCP regulations
-
B
To verify that the configured system meets all protocol requirements before use in the actual trial
-
C
To validate the statistical software used for analysis
-
D
To obtain IRB approval for data collection