When reviewing a retrospective appraisal, the reviewer should evaluate the work using market conditions as of which date?
-
A
The date the review is being performed
-
B
The effective date of the original appraisal
-
C
The date of the reviewer's inspection
-
D
The date the report was transmitted to the client