Reading Blueprints and Interpreting Paint Specifications Flashcards

6 cards from real C33 practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Reading Blueprints and Interpreting Paint Specifications flashcards as text
  1. On architectural blueprints, paint finish schedules are typically found on which type of drawing sheet?

    Answer: Architectural finish schedule sheets (A-series)

    Paint and finish specifications are located on Architectural (A-series) sheets, typically in the room finish schedule.

  2. A paint specification calls for 'SSPC-SP6 Commercial Blast Cleaning' of steel surfaces. What does this preparation standard require?

    Answer: Removal of at least two-thirds of all visible surface contamination by abrasive blasting

    SSPC-SP6 Commercial Blast Cleaning requires removal of at least two-thirds of visible residues by abrasive blasting.

  3. In project specifications, Division 09 90 00 covers which scope of work?

    Answer: Painting and Coating

    Under the CSI MasterFormat, Division 09 90 00 covers Painting and Coating specifications.

  4. A specification requires 'DFT of 3.0 mils minimum.' What does DFT mean and how is it measured?

    Answer: Dry Film Thickness - measured with a magnetic or electronic gauge

    DFT stands for Dry Film Thickness, measured in mils using magnetic gauges on ferrous substrates or electronic gauges on non-ferrous substrates.

  5. When reading blueprints, a C-33 contractor encounters 'PT-1' in the room finish schedule. What does this typically reference?

    Answer: Paint Type 1 - a specific coating system defined in the specifications

    PT-1 in a finish schedule refers to Paint Type 1, a coding system where each number corresponds to a specific coating system in the project specifications.

  6. A paint specification lists an 'acceptable products' section naming three manufacturers. What must the contractor do to use a product not on this list?

    Answer: Submit a formal substitution request with technical data proving equivalence

    To use an unlisted product, the contractor must submit a formal substitution request with technical data proving equivalence for the architect's review.