C27 LICENSE Cheat Sheet 2026

The 30 highest-yield C27 LICENSE facts, distilled from real exam questions. Print it, save it as a PDF, or study it here β€” free, no sign-up.

115 questions
180 min time limit
72% to pass
  1. What is the purpose of a rain sensor or weather-based controller in an irrigation system? β†’ To automatically shut off irrigation during or after rainfall
  2. When performing a 'rejuvenation pruning' on a severely overgrown, multi-stemmed deciduous shrub, what is the recommended practice? β†’ Cut all stems down to about 6-12 inches from the ground in late winter or early spring.
  3. What is the primary visual indicator of powdery mildew on landscape plants? β†’ White to grayish powdery coating on leaf surfaces and stems
  4. Does the $500 project value limit include both labor and materials? β†’ Yes, both labor and materials are included in the total project value.
  5. What is the primary purpose of applying a 3-inch layer of organic mulch to all exposed soil surfaces in a newly planted landscape bed? β†’ To retain soil moisture, suppress weeds, and regulate soil temperature.
  6. When installing a perforated pipe for a French drain, what is the correct orientation for the drainage holes? β†’ Facing downward, to allow collected water to exit and be carried away.
  7. Which insect vector is primarily responsible for spreading citrus greening disease (Huanglongbing) to citrus trees? β†’ Asian citrus psyllid (Diaphorina citri)
  8. Who benefits from the contractor’s bond? β†’ The client, for financial recovery.
  9. Under California law, which document must a landscaping contractor possess before applying restricted-use pesticides (RUPs)? β†’ A Qualified Applicator License (QAL) or certificate from the CDFA
  10. What does 'water budget' mean in the context of California landscape water regulations? β†’ The maximum annual water allowance for a landscape based on local ET data
  11. What is required for the contractor’s bond in the C-27 application process? β†’ A bond amount typically set at $15,000.
  12. During a grading operation on a windy day, what is the contractor's primary responsibility regarding airborne particles? β†’ Post signs warning of the dusty conditions.
  13. Which plants are most appropriate for drought-tolerant landscaping in California's climate? β†’ Native and Mediterranean-climate plants
  14. What should a contractor do if they do not have employees? β†’ Skip the workers' compensation insurance requirement.
  15. If an automatic irrigation valve fails to shut off after a watering cycle, what is the most common component to investigate first? β†’ A faulty solenoid or debris in the valve diaphragm.
  16. Under California pesticide regulations, how long must pesticide application records be retained by a licensed applicator? β†’ 3 years from the date of application
  17. Which irrigation method provides the greatest water conservation in a drought-tolerant landscape? β†’ Drip irrigation
  18. Is continuing education required for maintaining a C-27 Landscaping Contractor License? β†’ No, there is no continuing education requirement.
  19. Which type of mulch is most effective for conserving soil moisture in drought-tolerant landscapes? β†’ Organic wood chip mulch
  20. What is the first step in the application process for a C-27 Landscaping Contractor License? β†’ Submit an application to the Contractors State License Board (CSLB).
  21. What additional step must be completed if the applicant has employees? β†’ Submit proof of workers' compensation insurance.
  22. What is the legal consequence of contracting in California without a valid license for work valued over $500? β†’ It is a misdemeanor and the contractor loses the right to sue to collect payment
  23. What is required to renew a C-27 Landscaping Contractor License? β†’ Submit a renewal application and pay the renewal fee.
  24. A landscaping crew is using a wood chipper to dispose of tree trimmings. Which of the following is a critical safety practice required by OSHA? β†’ Using a lockout/tagout system to de-energize the machine before clearing a jam.
  25. Which of the following factors is the PRIMARY determinant of friction loss in an irrigation pipe? β†’ The velocity and volume of water flow.
  26. Which document must a California contractor provide to a homeowner before starting a home improvement project? β†’ A written contract that includes a three-day right to cancel notice
  27. When grading a landscape to ensure proper surface drainage away from a building's foundation, what is the generally accepted minimum slope? β†’ 2% (1/4 inch per foot)
  28. Which of the following is an example of a biological control method for managing aphid populations in a landscape? β†’ Releasing or encouraging populations of ladybugs (Coccinellidae)
  29. Which California agency is responsible for setting statewide outdoor water use restrictions that affect landscaping contractors? β†’ State Water Resources Control Board
  30. What is the primary goal of xeriscaping in residential landscaping? β†’ Reducing water usage through drought-tolerant design