- What is the purpose of a rain sensor or weather-based controller in an irrigation system? β To automatically shut off irrigation during or after rainfall
- When performing a 'rejuvenation pruning' on a severely overgrown, multi-stemmed deciduous shrub, what is the recommended practice? β Cut all stems down to about 6-12 inches from the ground in late winter or early spring.
- What is the primary visual indicator of powdery mildew on landscape plants? β White to grayish powdery coating on leaf surfaces and stems
- Does the $500 project value limit include both labor and materials? β Yes, both labor and materials are included in the total project value.
- What is the primary purpose of applying a 3-inch layer of organic mulch to all exposed soil surfaces in a newly planted landscape bed? β To retain soil moisture, suppress weeds, and regulate soil temperature.
- When installing a perforated pipe for a French drain, what is the correct orientation for the drainage holes? β Facing downward, to allow collected water to exit and be carried away.
- Which insect vector is primarily responsible for spreading citrus greening disease (Huanglongbing) to citrus trees? β Asian citrus psyllid (Diaphorina citri)
- Who benefits from the contractorβs bond? β The client, for financial recovery.
- Under California law, which document must a landscaping contractor possess before applying restricted-use pesticides (RUPs)? β A Qualified Applicator License (QAL) or certificate from the CDFA
- What does 'water budget' mean in the context of California landscape water regulations? β The maximum annual water allowance for a landscape based on local ET data
- What is required for the contractorβs bond in the C-27 application process? β A bond amount typically set at $15,000.
- During a grading operation on a windy day, what is the contractor's primary responsibility regarding airborne particles? β Post signs warning of the dusty conditions.
- Which plants are most appropriate for drought-tolerant landscaping in California's climate? β Native and Mediterranean-climate plants
- What should a contractor do if they do not have employees? β Skip the workers' compensation insurance requirement.
- If an automatic irrigation valve fails to shut off after a watering cycle, what is the most common component to investigate first? β A faulty solenoid or debris in the valve diaphragm.
- Under California pesticide regulations, how long must pesticide application records be retained by a licensed applicator? β 3 years from the date of application
- Which irrigation method provides the greatest water conservation in a drought-tolerant landscape? β Drip irrigation
- Is continuing education required for maintaining a C-27 Landscaping Contractor License? β No, there is no continuing education requirement.
- Which type of mulch is most effective for conserving soil moisture in drought-tolerant landscapes? β Organic wood chip mulch
- What is the first step in the application process for a C-27 Landscaping Contractor License? β Submit an application to the Contractors State License Board (CSLB).
- What additional step must be completed if the applicant has employees? β Submit proof of workers' compensation insurance.
- What is the legal consequence of contracting in California without a valid license for work valued over $500? β It is a misdemeanor and the contractor loses the right to sue to collect payment
- What is required to renew a C-27 Landscaping Contractor License? β Submit a renewal application and pay the renewal fee.
- A landscaping crew is using a wood chipper to dispose of tree trimmings. Which of the following is a critical safety practice required by OSHA? β Using a lockout/tagout system to de-energize the machine before clearing a jam.
- Which of the following factors is the PRIMARY determinant of friction loss in an irrigation pipe? β The velocity and volume of water flow.
- Which document must a California contractor provide to a homeowner before starting a home improvement project? β A written contract that includes a three-day right to cancel notice
- When grading a landscape to ensure proper surface drainage away from a building's foundation, what is the generally accepted minimum slope? β 2% (1/4 inch per foot)
- Which of the following is an example of a biological control method for managing aphid populations in a landscape? β Releasing or encouraging populations of ladybugs (Coccinellidae)
- Which California agency is responsible for setting statewide outdoor water use restrictions that affect landscaping contractors? β State Water Resources Control Board
- What is the primary goal of xeriscaping in residential landscaping? β Reducing water usage through drought-tolerant design