Question 1: In linear programming, the simplex method moves from one basic feasible solution to another by performing which operation?
- Gradient descent step
- Pivot operation on the basis (Correct answer)
- Branch and bound iteration
- Lagrangian relaxation
Correct answer: Pivot operation on the basis
The simplex method performs a pivot to swap one variable into the basis and one out, moving to an adjacent vertex of the feasible polytope.
Question 2: What does the 'takt time' represent in lean manufacturing?
- The time it takes to complete one production cycle
- The available production time divided by customer demand rate (Correct answer)
- The bottleneck station cycle time
- The total value-added time per unit
Correct answer: The available production time divided by customer demand rate
Takt time = available production time รท customer demand, setting the heartbeat or pace of production needed to meet demand.
Question 3: In statistical process control, a control chart signals an out-of-control condition when a point falls beyond how many standard deviations from the centerline (under standard Western Electric rules)?
- 1
- 2
- 3 (Correct answer)
- 4
Correct answer: 3
Standard control limits are set at ยฑ3 sigma; a point beyond these limits signals a likely assignable cause.
Question 4: Which type of production layout arranges machines by the type of operation they perform, grouping all lathes together, all drills together, etc.?
- Product layout
- Cellular layout
- Process layout (Correct answer)
- Fixed-position layout
Correct answer: Process layout
A process (functional) layout groups similar machines or functions together, suitable for low-volume, high-variety production.
Question 5: The EOQ (Economic Order Quantity) model minimizes the sum of which two cost components?
- Setup cost and quality cost
- Ordering cost and holding cost (Correct answer)
- Shortage cost and production cost
- Transportation cost and inspection cost
Correct answer: Ordering cost and holding cost
EOQ balances ordering (or setup) costs against inventory holding costs to find the quantity that minimizes total annual inventory cost.
Question 6: In work measurement, a 'normal time' is calculated by multiplying observed time by which factor?
- Allowance factor
- Performance rating factor (Correct answer)
- Utilization factor
- Learning curve exponent
Correct answer: Performance rating factor
Normal time = Observed time ร Performance rating, adjusting the observed time to what a 100%-pace worker would take.
Question 7: Which supply chain risk strategy involves holding duplicate suppliers or inventory buffers to protect against disruptions?
- Lean strategy
- Speculative strategy
- Redundancy strategy (Correct answer)
- Postponement strategy
Correct answer: Redundancy strategy
Redundancy strategies (dual sourcing, safety stock) trade cost for resilience by ensuring backup capacity when primary sources fail.
In linear programming, the simplex method moves from one basic feasible solution to another by performing which operation?