What is a 'preventive maintenance' (PM) program and why is it preferred over reactive maintenance?
-
A
Maintenance performed only after equipment fails to maximize equipment use before replacement
-
B
Scheduled maintenance performed at regular intervals to prevent failures, reducing downtime and extending equipment life
-
C
Maintenance performed by prevention specialists rather than regular building engineers
-
D
A budget reserve set aside exclusively for unexpected emergency repairs