Plant Maintenance (PM) Flashcards
7 cards from real BCSE ERP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Plant Maintenance (PM) flashcards as text
What is the purpose of order settlement in SAP Plant Maintenance?
Answer: To transfer maintenance costs from the order to a receiver such as a cost center or fixed asset
Order settlement (transaction KO88) distributes the actual costs accumulated on a maintenance order to one or more receivers (cost center, asset, or profitability segment) for proper financial reporting.
In a maintenance order lifecycle, what does 'Business Completion' (TECO/CLSD) signify?
Answer: All technical and business activities are complete and the order can be settled and archived
Business Completion (status CLSD) indicates that all technical work is done, costs are settled, and the order is fully closed, preventing further postings and making it eligible for archiving.
Which SAP PM object represents the permanent, fixed location where equipment is installed in a plant?
Answer: Functional Location
A Functional Location is a permanent structural element of the plant (e.g., a pump station or production line) where equipment is installed and maintained.
Which integration point connects SAP Plant Maintenance with Financial Accounting (FI)?
Answer: Cost settlement from maintenance orders to cost centers or fixed assets
The key FI-PM integration point is cost settlement: actual costs posted to maintenance orders (labor, materials, services) are transferred to FI cost objects during settlement.
What is the primary role of a Work Center in SAP Plant Maintenance?
Answer: Representing the people or machines (resources) that perform maintenance work
A Work Center in PM defines a group of maintenance technicians or machines, including their capacity, cost rates, and scheduling parameters used in maintenance orders and task lists.
What does the ABC indicator on an Equipment Master Record in SAP PM signify?
Answer: The criticality of the equipment to production operations (A=high, B=medium, C=low)
The ABC indicator classifies equipment by its criticality to production: A = critical (failure causes major impact), B = important, C = low priority, helping prioritize maintenance resources.
What does 'MTTR' stand for in the context of SAP Plant Maintenance performance metrics?
Answer: Mean Time To Repair — the average time required to restore equipment to working condition
MTTR (Mean Time To Repair) is a key PM KPI measuring the average duration from equipment failure to restoration, used to evaluate maintenance efficiency and workforce performance.