During a RP assembly test, the differential pressure across check valve #1 drops below the minimum threshold. What is the correct next step?
-
A
Record it as a pass since any reading is acceptable
-
B
Record the assembly as failed and tag it for repair
-
C
Re-test immediately without resetting the test kit
-
D
Increase supply pressure and re-test