← All ASP Flashcard Decks

Environmental Management Flashcards

7 cards from real ASP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Environmental Management flashcards as text
  1. Under CERCLA (Superfund), which party can be held liable for cleanup costs at a contaminated site even if they properly disposed of waste according to regulations at the time?

    Answer: Any potentially responsible party including past owners, operators, and waste generators

    CERCLA imposes strict, joint and several liability on all PRPs — current owners, past owners, operators, arrangers, and transporters — regardless of regulatory compliance at the time of disposal.

  2. A facility's stormwater runoff from an industrial site must be managed under which specific Clean Water Act program?

    Answer: NPDES Industrial Stormwater Permit program

    Industrial facilities disturbing stormwater must obtain an NPDES stormwater permit (often a general permit) and implement a Stormwater Pollution Prevention Plan (SWPPP).

  3. The 'bubble concept' under the Clean Air Act allows a facility to:

    Answer: Exempt new emission sources from permitting if total facility emissions stay below thresholds

    The bubble concept treats an entire plant as a single emission source, allowing internal emission offsets so that new or modified sources don't trigger NSR permitting as long as net facility emissions don't increase.

  4. Which environmental management tool uses a 'cradle-to-grave' approach to evaluate the total environmental impact of a product or process?

    Answer: Life Cycle Assessment (LCA)

    Life Cycle Assessment quantifies environmental impacts across all stages of a product's life — from raw material extraction through production, use, and end-of-life disposal.

  5. Under the Resource Conservation and Recovery Act (RCRA), the land disposal restrictions (LDRs) program primarily requires that hazardous wastes:

    Answer: Meet specific treatment standards before land disposal

    LDRs prohibit land disposal of hazardous wastes until they have been treated to meet EPA-specified technology-based or concentration-based treatment standards.

  6. A safety professional identifying that a facility's boiler emissions require a Title V operating permit under the Clean Air Act should recognize that Title V applies to:

    Answer: Major sources emitting above threshold quantities of regulated air pollutants

    Title V permits are required for major sources, generally those emitting 100 tons/year or more of a regulated pollutant (lower thresholds apply in non-attainment areas and for HAPs).

  7. When conducting an environmental audit, the primary distinction between a compliance audit and a management system audit is that a management system audit evaluates:

    Answer: The effectiveness of the organization's processes for achieving environmental objectives

    A management system audit assesses whether the EMS is properly implemented and effective at achieving goals, whereas a compliance audit checks adherence to specific legal requirements.