Under FAR Part 21, what is required before a manufacturer can begin production of a type-certificated aircraft?
-
A
A letter of authorization from the local FSDO
-
B
A Production Approval Holder (PAH) authorization such as a Production Certificate
-
C
Written approval from the aircraft's original designer
-
D
A temporary airworthiness certificate for the prototype