← All ASC Flashcard Decks

ASC Stroke Program Certification & Standards Flashcards

6 cards from real ASC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 ASC Stroke Program Certification & Standards flashcards as text
  1. Which organization provides Primary Stroke Center (PSC) certification in the United States?

    Answer: The Joint Commission

    The Joint Commission is the primary accrediting body that certifies Primary, Thrombectomy-Capable, and Comprehensive Stroke Centers in the US.

  2. A Comprehensive Stroke Center (CSC) must demonstrate 24/7 availability of which capability beyond PSC requirements?

    Answer: Mechanical thrombectomy

    CSCs must offer around-the-clock endovascular mechanical thrombectomy, distinguishing them from Primary Stroke Centers.

  3. What minimum door-to-needle (DTN) time benchmark is used by The Joint Commission's Target: Stroke program?

    Answer: 60 minutes

    The Joint Commission's Target: Stroke initiative sets 60 minutes as the benchmark DTN time for IV tPA administration.

  4. Which stroke center designation level is specifically designed to serve rural communities with limited resources?

    Answer: Acute Stroke Ready Hospital (ASRH)

    The Acute Stroke Ready Hospital designation was created to extend organized stroke care to facilities that cannot meet full PSC requirements.

  5. Under Joint Commission stroke certification, what is the required minimum number of Get With The Guidelines–Stroke performance measures that must be reported?

    Answer: All applicable core measures

    TJC stroke certification requires hospitals to collect and report all applicable GWTG-Stroke core measures to demonstrate performance.

  6. A stroke coordinator is preparing for a Joint Commission recertification visit. Disease-Specific Care certification is typically renewed every how many years?

    Answer: 2 years

    Joint Commission Disease-Specific Care certifications, including stroke, are renewed on a 2-year cycle with an on-site review.