  1. What are Health, Safety, and Welfare (HSW) continuing education hours? β†’ Hours dedicated to topics that directly impact public safety and wellbeing.
  2. What is the function of rebar in reinforced concrete? β†’ Resist tensile stresses concrete cannot handle
  3. What is 'reciprocity' in architectural licensure? β†’ The process by which one state recognizes a license from another state
  4. Photovoltaic (PV) solar panels convert sunlight directly into which form of energy? β†’ Electrical energy
  5. Which structural material has equal strength in both tension and compression? β†’ Structural steel
  6. What is typically required to maintain an architectural license in most U.S. jurisdictions? β†’ Annual license renewal fees.
  7. Which factors should be considered during a site analysis for building orientation? β†’ Prevailing wind direction.
  8. A cantilever beam experiences its maximum bending moment at: β†’ The fixed support
  9. Which AIA document governs the relationship between the architect and an engineering subconsultant? β†’ AIA C401
  10. Which of the following is NOT a type of live load? β†’ Self-weight of the concrete slab
  11. What is the primary function of a state architectural licensing board? β†’ To protect the public by regulating architectural practice
  12. An architect who seals drawings for work they did not prepare or supervise is committing: β†’ Fraud and a violation of professional standards
  13. What is the deflection limit for a floor beam supporting a plaster ceiling under live load according to common practice? β†’ L/360
  14. The stiffness of a structural element is best described as: β†’ Its resistance to deformation under load
  15. A Life Cycle Assessment (LCA) of building materials evaluates environmental impacts across which scope? β†’ From raw material extraction through end-of-life disposal
  16. What happens if an architect fails to renew their license by the required deadline? β†’ They must pay a late renewal fee and fulfill any additional requirements.
  17. In a building water conservation strategy, 'graywater' refers to water collected from which sources? β†’ Sinks, showers, and laundry fixtures
  18. An architect discovers a potentially hazardous condition during construction administration that the contractor has not reported. The architect should first: β†’ Notify the owner and recommend corrective action
  19. For a south-facing window in a hot climate, which glazing parameter most directly controls unwanted summer solar heat gain? β†’ Solar heat gain coefficient (SHGC)
  20. Which LEED certification level requires a minimum of 80 points out of 110 possible? β†’ Platinum
  21. Which of the following responsibilities does the architect have during project closeout? β†’ Issuing the Certificate of Substantial Completion.
  22. Which of the following items should be included in the contractor’s application for payment? β†’ Value of completed work.
  23. Which of the following best describes the goal of an adjacency matrix? β†’ To evaluate spatial relationships between program elements.
  24. Which program administered by the EPA uses Energy Use Intensity (EUI) as a key metric to benchmark commercial building energy performance? β†’ ENERGY STAR
  25. A client is developing a total project budget for a new restaurant. Which of the following items is considered a 'soft cost'? β†’ The cost of the land and financing.
  26. In a high-rise building, the vertical stacking of mechanical rooms, elevator shafts, and plumbing risers has the GREATEST impact on which architectural element? β†’ Floor plan layout and net usable area
  27. When an architect hires a structural engineer for a project, the agreement between them is typically documented in which AIA contract form? β†’ AIA C401 - Architect-Consultant Agreement
  28. Which stormwater management strategy uses vegetated, sloped channels to slow runoff, filter sediment, and promote groundwater infiltration? β†’ Bioswale
  29. Which load type acts horizontally on a structure due to soil pressure? β†’ Lateral earth pressure
  30. How can architects ensure compliance with evolving licensure requirements? β†’ Subscribe to updates from their state licensing board.