Under API 510, which factor is MOST important when establishing the next inspection interval for a pressure vessel?
-
A
The vessel's original construction date
-
B
The remaining corrosion allowance divided by the corrosion rate
-
C
The date of the last external inspection
-
D
The operating temperature only