  1. Which cross-validation strategy is most appropriate when your dataset has significant temporal ordering?

    Answer: Time-series split (walk-forward)

    Time-series split (walk-forward validation) prevents data leakage by always training on past data and validating on future data.

  2. A model achieves 99% accuracy on an imbalanced dataset where 99% of samples are class 0. What is the most important additional metric to evaluate?

    Answer: Matthews Correlation Coefficient (MCC)

    MCC accounts for all four confusion matrix values and provides a reliable metric even when classes are highly imbalanced.

  3. What does a calibration curve (reliability diagram) measure in a classifier?

    Answer: Alignment between predicted probabilities and actual outcome frequencies

    A calibration curve plots predicted probabilities against actual frequencies to show whether a model's confidence scores are trustworthy.

  4. You observe that validation loss stops improving after epoch 20 but training loss keeps decreasing. The correct QA response is to:

    Answer: Apply early stopping at epoch 20 and regularize the model

    The divergence between training and validation loss is a clear overfitting signal; early stopping and regularization directly address it.

  5. Which technique quantifies uncertainty by training multiple models on bootstrap samples of the training data?

    Answer: Bootstrap aggregating (Bagging)

    Bagging trains multiple models on bootstrapped datasets; the variance of their predictions estimates model uncertainty.

  6. During error analysis, you find that 80% of misclassifications occur on one specific data slice. The best QA action is to:

    Answer: Upsample that slice and retrain with targeted augmentation

    Targeted upsampling and augmentation of the underperforming slice directly addresses the root cause of slice-specific failures.

  7. The Brier Score is used to evaluate:

    Answer: Calibration and sharpness of probabilistic forecasts

    The Brier Score is the mean squared error of probability predictions, measuring both calibration and sharpness of probabilistic classifiers.