โ† All AM Flashcard Decks

Aircraft Maintenance Procedures & Documentation Flashcards

7 cards from real AM practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Aircraft Maintenance Procedures & Documentation flashcards as text
  1. When must a maintenance record entry be made according to 14 CFR Part 43?

    Answer: Before the aircraft is approved for return to service

    14 CFR Part 43.9 requires a maintenance record entry to be made before the aircraft is approved for return to service.

  2. Which document authorizes an A&P mechanic to perform maintenance on a specific aircraft make and model?

    Answer: The aircraft's Approved Maintenance Manual (AMM)

    The Approved Maintenance Manual (AMM) provides the approved data and procedures specific to that aircraft make and model.

  3. What is the purpose of a Mechanical Interruption Summary (MIS) report?

    Answer: To document unscheduled engine shutdowns or diversions

    A Mechanical Interruption Summary records unscheduled engine shutdowns, flight diversions, and air turnbacks caused by mechanical issues.

  4. A logbook entry for an annual inspection must be signed by which of the following?

    Answer: An A&P mechanic with Inspection Authorization (IA)

    Annual inspections must be signed off by an A&P mechanic holding an Inspection Authorization (IA) per 14 CFR Part 43.

  5. What does the term 'back to birth' traceability mean in aircraft maintenance?

    Answer: Documentation that traces a part's history from initial manufacture through all subsequent uses

    'Back to birth' traceability means complete documented history of a part from its manufacture through every installation and removal.

  6. Which of the following is NOT required in a maintenance record entry per 14 CFR 43.9?

    Answer: Total flight hours logged on the aircraft

    14 CFR 43.9 requires description of work, date, name, certificate number, and kind of certificate; total aircraft flight hours is not a mandated element.

  7. When using an Engineering Order (EO) for a maintenance task, what must the mechanic do upon completion?

    Answer: Sign off the EO and reference it in the maintenance record

    The mechanic must sign off the Engineering Order upon task completion and reference it in the aircraft maintenance record.