When placing concrete in hot weather (above 90°F), which practice best prevents rapid moisture loss during flatwork placement?
-
A
Increase the water-cement ratio
-
B
Use sunshades, windbreaks, and mist the subgrade before placement
-
C
Add extra cement to the mix
-
D
Pour concrete thicker than specified