ACI Curing, Protection & Quality Control 3 — Questions and Answers
Question 1: Which chemical admixture is commonly used in hot weather concreting to offset the accelerating effect of high temperatures?
- Calcium chloride
- Fly ash accelerator
- Set retarder (Correct answer)
- Air-entraining agent
Correct answer: Set retarder
Set retarders slow hydration, compensating for the accelerated set caused by elevated concrete temperatures in hot weather.
Question 2: The water-to-cementitious-materials ratio (w/cm) primarily affects which property of hardened concrete?
- Color uniformity
- Compressive strength and durability (Correct answer)
- Surface texture
- Workability only
Correct answer: Compressive strength and durability
The w/cm ratio is the single most important factor controlling concrete compressive strength and long-term durability.
Question 3: During cold weather concreting, the concrete temperature at the point of placement should be maintained at a minimum of:
- 25°F (-4°C)
- 40°F (5°C)
- 50°F (10°C) (Correct answer)
- 55°F (13°C)
Correct answer: 50°F (10°C)
ACI 306 requires concrete to be placed and maintained at a minimum of 50°F (10°C) to ensure adequate hydration in cold weather.
Question 4: What is the primary purpose of fogging or misting water over fresh concrete in hot, dry, or windy conditions?
- To add mix water to restore slump
- To reduce plastic shrinkage cracking by slowing evaporation (Correct answer)
- To cool the subgrade before placement
- To wash excess bleed water off the surface
Correct answer: To reduce plastic shrinkage cracking by slowing evaporation
Fogging raises humidity immediately above the slab surface, reducing evaporation rate and thus preventing plastic shrinkage cracking.
Question 5: A cylinder break at 28 days shows strength below the specified f'c. What is the first step in ACI-compliant quality control response?
- Immediately remove the suspect concrete
- Conduct additional testing such as cores per ACI 318 (Correct answer)
- Stop all concrete placement on the project
- Double the curing period for all future placements
Correct answer: Conduct additional testing such as cores per ACI 318
ACI 318 requires taking cores from the suspect area as the next investigative step before any remedial action is decided.
Question 6: Which test is performed in the field to determine the air content of fresh concrete?
- Kelly ball test
- Pressure meter (Type B) test (Correct answer)
- Vebe consistometer test
- Proctor compaction test
Correct answer: Pressure meter (Type B) test
The pressure meter (ASTM C231) is the most common field method for measuring air content in fresh concrete.
Question 7: Plastic shrinkage cracking typically occurs during which phase of concrete construction?
- During demolding after 24 hours
- Before the concrete has set while still in a plastic state (Correct answer)
- During the 7-day curing period
- During drying shrinkage after 28 days
Correct answer: Before the concrete has set while still in a plastic state
Plastic shrinkage cracks form when the evaporation rate from the surface exceeds the rate of bleed water supply, while concrete is still plastic.
Which chemical admixture is commonly used in hot weather concreting to offset the accelerating effect of high temperatures?