ACI Cold & Hot Weather Concreting 2 — Questions and Answers
Question 1: When concreting in cold weather, what is the minimum concrete temperature recommended by ACI 306 for sections greater than 12 inches thick?
- 45°F (7°C) (Correct answer)
- 50°F (10°C)
- 55°F (13°C)
- 60°F (16°C)
Correct answer: 45°F (7°C)
ACI 306 specifies a minimum placed concrete temperature of 45°F for sections greater than 12 inches thick, as thicker sections retain heat better.
Question 2: During hot weather concreting, which admixture type is most commonly used to counteract accelerated setting?
- Type A water-reducing retarder
- Type C accelerating admixture
- Type E water-reducing accelerator
- Type B retarding admixture (Correct answer)
Correct answer: Type B retarding admixture
Type B retarding admixtures slow the hydration reaction, offsetting the accelerated setting caused by high temperatures.
Question 3: What is the primary risk of using calcium chloride as an accelerator in cold weather concrete containing embedded steel?
- It causes excessive bleeding
- It promotes corrosion of the reinforcement (Correct answer)
- It reduces compressive strength
- It increases air entrainment
Correct answer: It promotes corrosion of the reinforcement
Calcium chloride is a chloride-based accelerator that can initiate and accelerate corrosion of embedded steel reinforcement.
Question 4: In hot weather, why should concrete be placed as quickly as possible after mixing?
- To prevent excessive bleed water
- To avoid loss of slump and premature stiffening (Correct answer)
- To reduce the water-cement ratio
- To improve air entrainment stability
Correct answer: To avoid loss of slump and premature stiffening
High temperatures accelerate hydration, causing rapid slump loss and premature stiffening if placement is delayed.
Question 5: Which curing method is particularly effective in cold weather because it provides both insulation and moisture retention?
- Liquid membrane-forming compound
- Insulating blankets with moisture underneath (Correct answer)
- White-pigmented plastic sheeting only
- Steam curing at ambient pressure
Correct answer: Insulating blankets with moisture underneath
Insulating blankets placed over wet burlap or plastic sheeting trap both heat and moisture, satisfying cold-weather curing requirements simultaneously.
Question 6: ACI 305 defines hot weather concreting conditions as any combination of factors that causes what primary concern?
- Excessive bleeding and segregation
- Rapid evaporation of mixing water and accelerated setting (Correct answer)
- Reduced air entrainment
- Increased shrinkage cracking only after hardening
Correct answer: Rapid evaporation of mixing water and accelerated setting
ACI 305 focuses on rapid moisture evaporation and accelerated setting as the defining hot-weather risks that impair concrete quality.
Question 7: What effect does high concrete temperature have on the required air-entraining admixture dosage?
- Less admixture is needed at higher temperatures
- Temperature has no effect on admixture dosage
- More admixture is needed to achieve the same air content (Correct answer)
- Air entrainment is not used in hot weather
Correct answer: More admixture is needed to achieve the same air content
Higher concrete temperatures reduce the effectiveness of air-entraining admixtures, requiring increased dosage to achieve the specified air content.
When concreting in cold weather, what is the minimum concrete temperature recommended by ACI 306 for sections greater than 12 inches thick?