โ† All AB Flashcard Decks

Deck Seamanship & Line Handling Flashcards

7 cards from real AB practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Deck Seamanship & Line Handling flashcards as text
  1. What does the term 'bight' refer to when working with lines?

    Answer: A loop or curve in a line that does not cross itself

    A bight is any curved section of line between the two ends that forms a loop without crossing itself.

  2. When securing a line to a cleat, how many figure-eight turns should be taken before finishing with a locking hitch?

    Answer: Two

    Two figure-eight turns around a cleat provide sufficient holding power before adding a single locking hitch to complete the belay.

  3. What is a 'preventer' line used for on deck?

    Answer: A secondary line rigged to prevent sudden uncontrolled movement of a spar or boom

    A preventer is a secondary line rigged to a boom or spar to prevent an accidental jibe or uncontrolled swing.

  4. Which condition most increases the risk of a mooring line parting unexpectedly?

    Answer: The line shows heat glazing or melted fibers from previous slipping

    Heat glazing reduces a synthetic line's strength significantly and indicates internal fiber damage that can cause sudden parting under load.

  5. When passing a line through a closed chock, what is the correct method?

    Answer: Use a messenger line led through the chock first

    A light messenger line is rove through the chock first, then used to pull the heavier mooring line through.

  6. What is the safe working load (SWL) relationship to a line's breaking strength typically used aboard ship?

    Answer: SWL equals the breaking strength divided by a safety factor of 5 or 6

    A safety factor of 5 to 6 is typically applied, so the SWL is the breaking strength divided by 5 or 6 to allow a margin for dynamic loads.

  7. What action should be taken if a running line (under load and moving) is found to be riding over itself on a winch drum?

    Answer: Stop the winch immediately and re-spool under controlled tension

    An override on a winch drum must be stopped immediately; the jammed turns must be cleared under controlled conditions before operation continues.

Deck Seamanship & Line Handling Flashcards โ€” AB Study Cards with Answers