When prioritizing the product backlog, the MoSCoW method categorizes items as:
-
A
Mandatory, optional, secondary, cancelled, waiting
-
B
Must have, Should have, Could have, Won't have
-
C
Maximum, Standard, Core, Wishlist
-
D
Mandatory, Scheduled, Conditional, Withheld