As soon as the project scope is defined, which of the following should kick-off the research process?

Correct! Wrong!

A project team wants to make sure that the results of a patient satisfaction tool they developed within a healthcare setting have a high degree of external validity. What does external validity mean?

Correct! Wrong!

What is the PRIMARY benefit to conducting post-occupancy research?

Correct! Wrong!

During the design process, personnel participated in a visioning session to identify perceived problems and to develop design concepts. A literature review was conducted to see if credible evidence could be found to support the suggested improvements. The findings were discussed with the staff. What was the PRIMARY reason for doing this?

Correct! Wrong!

A project team is interested in reducing patient falls and increasing staff satisfaction on an existing inpatient unit. There are a variety of design changes that could be made to achieve these goals. These include the installation of a non-slip type of flooring, a decentralized nurse station layout, and handrails in the patient room. Given the limited budget, what should the project team do FIRST to determine where to invest its limited resources?

Correct! Wrong!