Construction Test 1

0%

Choose one of the following to represent the false statement:

Correct! Wrong!

For spans, couple roof is used.

Correct! Wrong!

When drilling in ________, rotary drilling is the fastest method.

Correct! Wrong!

________ are the best kind of piles for soft soil with little resistance to the flow of concrete.

Correct! Wrong!

Only after ____ days may the formwork on the underside of the slabs be removed.

Correct! Wrong!

The soil's bearing capacity cannot be increased by

Correct! Wrong!

The depth of soil exploration for large embankments and dams should not be less than _______.

Correct! Wrong!

If the soil is _______, a pile foundation is typically offered.

Correct! Wrong!

A cross joint is _______ to the plumb line when it is aligned.

Correct! Wrong!

_______ is a protruding element that is typically used to support a truss.

Correct! Wrong!

For beams and slabs, concrete slump should range from ________.

Correct! Wrong!