Singer Building, Woolworth Building, Chrysler Building, Empire State Building, Sears Tower, Petronas Twin Tower, The World Trade Center, Taipei 101, Burj Dubai
The correct answer is Framework, it provides a structured approach for developing and maintaining information systems. It outlines the different phases involved in the process, such as planning, analysis, design, implementation and maintenance. By following this framework, organizations can ensure that their information systems are developed in a systematic and efficient manner, leading to successful outcomes.
During the implementation phase of a project, the project plan is executed and the actual work of the project is carried out. This includes tasks such as assigning resources, monitoring progress and completing deliverables. Therefore, the statement "During the implementation phase, performed" is true.
The correct answer is "Studying space and telling the future". This is because ancient Egyptians believed that the alignment of the pyramids with certain stars and constellations could provide insight into the future and afterlife. Additionally, the pyramids were used as observatories to study celestial bodies and track the movements of the stars.
Big Ben is the correct answer because it is a famous European construction that is leaning. Located in London, Big Ben is the nickname for the Great Bell of the clock at the north end of the Palace of Westminster. Over the years, the tower has developed a slight lean due to the soft ground it was built on. This lean has become a distinctive feature of iconic landmark.
System integration refers to the process of combining inter-related elements, such as software, hardware and technology, in order to achieve a common objective. It involves ensuring that all the components of a system work together seamlessly and efficiently. This can include integrating different software applications, connecting various hardware devices, and incorporating new technologies into an existing system. System integration is essential for organizations to steamline their operations, improve efficiency and enhance communication and collaboration between different departments or systems.
System thinking is a way of understanding an entity in terms of its purpose. It involves analyzing and comprehending the interconnectedness and interdependences of various components within a system to gain a holistic understanding. By considering the purpose of the system and how its different pats work together, system thinking helps identify patterns, relationships, and feedback loops that impact the overall functioning and effectiveness of the system. It enables individuals to view problems and situations from a broader perspective and make informed decisions to improve the system's performance.
The correct answer is "System". The given definition describes an array of components working together to achieve a specific goal or objective. A system is a structured and organized arrangement of elements that interact and function as a whole to perform a task or fulfill a purpose. It implies a planned and coordinated approach towards achieving a desired outcome.
Please select 3 correct answers
The three major steps followed in systems thinking are: First Identifying a containing whole (system) of which the thing to be explained is a part, Second Explaining the behavior or properties of the containing whole, and Third Explaining the behavior or properties of the thing to be explained in terms of its role or function within its containing whole. This approach allows for a holistic understanding of how different elements within a system interact and contribute to the overall behavior or properties of the system. By considering the relationships and dependencies between the parts and the whole, systems thinking provides a more comprehensive explanation.
A predictive Model is the correct answer because it involves the ability to clearly articulate the scope of a project and predict the schedule and cost. This model relies on planning and forecasting based on historical data and assumptions. It allows for a more structured and controlled approach to project management, where all aspects are predetermined and can be estimated in advance. This contrasts with an adaptive model, which is more flexible and responsive to changes throughout the project. The other options, SDLC and conceptual model, do not specifically address the ability to predict schedule and cost.
The correct answer is Square based Pyramid. Khufu's Pyramid, also known as the great Pyramid of Giza, is a massive structure built during the reign of Pharaoh Khufu in ancient Egypt. It is a perfect example of a square based pyramid, with a square base and four triangular faces that meet at a single point, known as the apex. This shape is characteristic of many ancient Egyptian pyramids, including the other two pyramids at the Giza complex.